Home
About IIPM®
Training Schedule
PMP® Exam Prep.: Guaranteed Pass
PMP® Exam Prep Regular Course.
CAPM® Exam Prep.: Guaranteed Pass
CAPM® Exam Prep Regular Course
PgMP® Exam Prep.
PMI-SPSM Exam Prep.
PMI-RMPSM Exam Prep.
Feedback
Video Presentation Feedback
Online PMP® Exam Prep.
PDU Courses Offered       
Six Sigma Course       
Online Study Feedback
Shopping Cart
PM Conference
IT Project Management
Certified Construction Project Manager (CCPM®)
MS Project 2007
Corporate Social Responsibility (CSR)
Consultancy
PMO
PM Books Library
FAQs
Ask Ari
Feedback
Our Esteemed Clients
Key Personnel/Adjunct Faculty
IIPM® Training Hall
Visit to PMI® HQ
DPC-SIG for Construction PMs
Archive
Placement Opportunities
Contact us
Privacy Policy
Delivery Policy

CPM / PERT

Course Contents:

1. PM INTRODUCTION

a. Introduction
b. Project Planning
c. Scheduling
d. Controlling
e. Problems

2. BAR CHARTS AND MILESTONE CHARTS

a. Introduction
b. Development of bar chart
c. Shortcomings of bar charts and remedial measures
d. Milestone charts
e. Development of PERT network
f. Problems

3. ELEMENTS OF NETWORK

a. Introduction
b. Event
c. Activity
d. Dummy
e. Network rules
f. Graphical guidelines for network
g. Problems

4. PERT - TIME ESTIMATES

a. Introduction
b. Uncertainties : Use of PERT
c. Time estimates
d. Frequency Distribution
e. Mean, variance, standard deviation
f. Probability distribution
g. Beta distribution
h. Expected time
i. Problems

5. PERT - TIME COMPUTATIONS

a. Introduction
b. Earliest expected time
c. Formulation of TE
d. Latest allowable occurrence time
e. Formulation for TL
f. Combined tabular computations for TE and TL
g. Problems

6. PERT : NETWORK ANALYSIS

a. Slack
b. Critical path
c. Examples
d. Probability of meeting scheduled date
e. Problems

7. CPM - NETWORK ANALYSIS

a. Introduction
b. CPM : process
c. CPM : networks
d. Activity time estimate
e. Earliest event time
f. Latest allowable occurrence time
g. Combined tabular computations for TE and TL
h. Start and finish times of activity
i. Float
j. Critical activities and critical path
k. Examples
l. Problems

8. CPM-COST MODEL

a. Introduction
b. Project cost
c. Indirect project cost
d. Direct project cost
e. Slope of direct cost curve
f. Total project cost and optimum duration
g. Contracting the network for cost optimization
h. Steps in time cost optimization
i. Examples
j. Problems

9. RESOURCES ALLOCATION

a. Introduction
b. Resource usage profiles: histograms
c. Resources smoothing
d. Resources leveling
e. Problems

Course Duration:
 
2 days  - 9.0 am to 6.0 pm

Course fee :
       
Rs 5,000 + Service Tax . Fee can be paid by DD or Check drawn on “IIPM Chennai” or can be wire transferred at least 7 days before the course start date.

 Venue :
    
  Star hotel or IIPM’s  air-conditioned well furnished Training Hall , T.Nagar, Chennai. Download1, Download2, Download3, Download4.   


All trade marks / copyrights of other companies are respected and are properties of those companies.
PMI®, PMP®, CAPM®, PMBOK® Guide, PgMP® are trade marks / copyrights owned by PMI®, USA
For more details contact : marketing@iipmchennai.
org
All Rights Reserved © International Institute Of Project Management- Chennai ®IIPM